Kenya Railways puts proposed Lapsset SGR cost at $16bn; bulk on Isiolo-Nakodok line

lappset

Casual labourers at work at the new Lamu Port site in Kililana in Lamu West, Kenya. PHOTOS | KALUME KAZUNGU | NMG

Kenya will need at least Ksh2.4 trillion ($16 billion) to construct a proposed Standard Gauge Railway (SGR) on the Lamu Port-South Sudan-Ethiopia-Transport (Lapsset) corridor, according to projections by the Kenya Railways Corporation.

According to the parastatal, it would cost Ksh523.05 billion ($3.49 billion) to build a 544.4 kilometre SGR link to connect Lamu and Isiolo and a further Ksh476.7 billion ($3.178 billion) to extend the line from Isiolo to Moyale over a distance of 475.9km.